Book/Book Chapters
2010
1. Book Chapter; Yusnita Rahayu, Razali Ngah, Tharek Abdul Rahman, “A small novel ultra wideband antenna with slotted ground plane" in the book "Ultra Wideband", ISBN 978-953-307-139-8, Sciyo, Sept 2010, pp 427-444.
2. Book Chapter; Yusnita Rahayu, Razali Ngah, Tharek Abdul Rahman, "Slotted ultra wideband antenna for bandwidth enhancement" in the book "Ultra Wideband", ISBN 978-953-307-139-8, Sciyo, Sept 2010, pp 445-458.
2009
1. Book Chapter; Yusnita Rahayu, Tharek Abdul Rahman, Razali Ngah, “A small UWB antenna with slotted ground plane,” Penerbit UTM,2009.
2. Book Chapter; Yusnita Rahayu, Tharek Abdul Rahman, Razali Ngah, “Small slotted UWB antenna based on current distribution for bandwidth enhancement,” Penerbit UTM, 2009.
3. Book Chapter; Razali Ngah, Teguh Prakoso, Tharek Abdul Rahman, Mohd Amin Mualif, "Photonic antenna for long range wireless communication,” Penerbit UTM, 2009.
4. Book Chapter; Razali Ngah, Teguh Prakoso, Tharek Abdul Rahman, Goh Kuan Chean, "2.4 GHz Photonic antenna for wireless local area network,” Penerbit UTM, 2009.
2008
1. Editor, "Contemporary Studies on Rain Attenuation in Malaysia", Penerbit UTM, 2008, ISBN : 978-983-52-0686-3.
2. Book Chapter; Y.R. Naumar, T.A. Rahman, R. Ngah, P.S. Hall, “Numerical analysis of small Slotted Ultra Wideband Antenna Based on Current Distribution for bandwidth Enhancement”, European Electromagnectics (EUROEM 2008), Lausanne, Switzerland Julai 2008.
Research Monograph
1. Razali Ngah, “Intensity modulation direct detection for generating microwave signal,” Penerbit UTM,2007.
2. Razali Ngah, “Four wave mixing nonlinearity effect in radio over fiber system,” Penerbit UTM, 2007.
3. Razali Ngah, “Downlink radio access point for radio over fiber system,” Penerbit UTM, 2007.
4. Razali Ngah, “Front-end design of low power radio access point for radio over fiber technology,” Penerbit UTM, 2007
Technical Report
1. Razali Ngah, “Simulation and design of radio frequency (RF) circuits,” Research report (vote: 71483), submitted to RMC UTM, 2001.
2. Tharek Ab. Rahman, Razali Ngah, A. Tharmarajah, and Roaslan Abu samah, “Low power radio repeater station at UUM campus,” Project report,
submitted to RMC UTM, 1992.
3. Phase I status report, RLSA Project, Sept. 1998.
4. Phase II status report, RLSA Project, Mac. 1999.
5. Phase III status report, RLSA Project, Sept. 1999
6. Phase IV status report, RLSA Project Mac. 2000.
7. Final Report, RLSA Project, Sept. 2000
8. Internal audit report, PSM Operational, TOP Department, FKE, 28 Mac 2005.
9. Internal audit report, Laboratory Maintenance (equipment and room), TOP Department, FKE, 28 Mac 2005.
10. Internal audit report, Examination Paper Preparation/Continuous Evaluation, TOP Department, FKE, 29 Mac 2005.
11. Internal audit report, Continuous Evaluation Operational, TOP Department, FKE, 29 Mac 2005.
12. Internal audit report, Lecture Preparation, TOP Department, FKE, 31 Mac 2005.
13. Internal audit report, Lecture Operational, TOP Department, FKE, 31 Mac 2005.
14. Internal audit report, Pengendalian Penilaian Berterusan, MER Department FKE, April 2006.
15. Internal audit report, Examination Operational, FKE, Mei 2006.
16. Internal audit report, Laboratory Maintenance, INSEED Department, Julai 2006.
17. Internal audit report, Laboratory Maintenance, MICE Department, Julai 2006.
18. Laporan audit dalaman ISO 9001:2000, Penyediaan Kuliah/Makmal, Jabatan TOP FKE, Ogos 2007.
19. Laporan audit dalaman ISO 9001:2000, Penyediaan Kuliah/Makmal, Jabatan RACE FKE, Ogos 2007.
20. Laporan audit dalaman ISO 9001:2000, Penyediaan Kertas Peperiksaan, WCC FKE, Ogos 2007.
21. Laporan audit dalaman ISO 9001:2000, Penyediaan Kuliah/Makmal, WCC FKE, Ogos 2007.
22. Laporan audit dalaman ISO 9001:2000, Analisis Data, FKE, April 2007.
23. Laporan audit dalaman ISO 9001:2000, MKSP, FKE, April 2007.
24. Laporan audit dalaman ISO 9001:2000, Pengendalian Peperiksaan, FKE, April 2008.
25. Laporan audit dalaman ISO 9001:2000, Tindakan Pembetulan dan Pencegahan, FKE, April 2008.
26. Final Report FRGS Vot 78025, ”Optical Time Division Multiplexing (OTDM) for Optical Communication System,” Mei 2008.
27. Laporan audit dalaman ISO 9001:2000, Penyediaan Kertas Peperiksaan/Penilaian Berterusan (Perhubungan), FKE, Julai 2008.
28. Laporan audit dalaman ISO 9001:2000, Penyediaan Kertas Peperiksaan/Penilaian Berterusan (Kawalan), FKE, Julai 2008.
29. Laporan audit dalaman ISO 9001:2000, Pengendalian Penilaian Berterusan (Perhubungan), FKE, April 2009
30. Final Report Science Fund, 01-01-SF0038 (Vot. 79022), ”Radio Frequency (RF) Front End Design of Radio Access Point For Radio Over Fiber (ROF)
Technology,” Mei 2009.
31. Laporan audit dalaman ISO 9001:2000, Audit Dalam, FKE, Ogos 2009